Route Properties enable a user to assign move time between process steps in a routing. 

To Edit Route Properties

  1. From the Routings List, select the routing containing the step where you want to add move time
  2. Select Route Properties on the bottom left corner of the screen to open the Route Properties panel
  3. Select the move time cell you wish to change

Route Properties Data Element Descriptions

Data ElementDescriptionConstraints
Move TimeThe average time (in hours) it takes to move a transfer batch
to this step from the previous step.
≥ 0
Move MethodA text field enabling a user to record the movement method
between two steps. This is for informational use only and
does not impact the analysis.
Text